Notices
  • The number of good units produced after the value added operation is complete. This metric is used to document the quality of parts and workmanship in assemblies at the end of line or ready to ship state. This can be applied at the cell, value stream, group or facility level. At the cell or value stream levels, this would be the results of a functional test on the work done in the area. At the facility level this would be based on the Plant Pre-Delivery Inspection report for ready to ship assemblies either to a dealer/customer or a higher level component (engine, transmission, ...) being shipped interplant. At the group level, Pre-Delivery Inspection data should be used when Pre-Delivery Inspections are required. This is a results based metric.