Examples
  • October-November 1995: Testing to improve geophysical methods of installing water outlets in the prefectures of the Ogou and Kloto in the context of village hydraulics (UNICEF project).
    عضــــــو هيئــــــــة تحريــــــر المجلــــة العلميـــة “جيولوجيا كرواتيا”.
  • (c) To ensure physical access to water facilities or services that provide sufficient, safe and regular water; that have a sufficient number of water outlets to avoid prohibitive waiting times; and that are at a reasonable distance from the household;
    المؤشرات الاقتصادية والاجتماعية (الدورة السادسة، 1991)؛
  • (c) To ensure physical access to water facilities or services that provide sufficient, safe and regular water; that have a sufficient number of water outlets to avoid prohibitive waiting times; and that are at a reasonable distance from the household;
    (ج) ضمان الوصول المادي إلى مرافق أو خدمات المياه التي تقدم المياه بصورة كافية ومأمونة ومنتظمة؛ والتي لها عدد كافٍ من منافذ المياه لتجنب الانتظار لفترات تعجيزية؛ والتي تكون على بعد معقول من الأسر المعيشية؛
  • (c) To ensure physical access to water facilities or services that provide sufficient, safe and regular water; that have a sufficient number of water outlets to avoid prohibitive waiting times; and that are at a reasonable distance from the household;
    (ج) ضمان الوصول المادي إلى مرافق أو خدمات المياه التي توفر المياه بصورة كافية ومأمونة ومنتظمة؛ والتي لها عدد كافٍ من منافذ المياه لتجنب الانتظار لفترات تعجيزية؛ والتي تكون على بعد معقول من الأسر المعيشية؛
  • (c) To ensure physical access to water facilities or services that provide sufficient, safe and regular water; that have a sufficient number of water outlets to avoid prohibitive waiting times; and that are at a reasonable distance from the household;
    (ج) ضمان الوصول ماديا إلى مرافق أو خدمات المياه التي توفر المياه بصورة كافية ومأمونة ومنتظمة؛ والتي تتيح عدداً كافياً من منافذ المياه لتجنب الانتظار لفترات تعجيزية؛ والتي تكون على بعد معقول من الأسر المعيشية؛
  • The country is intent on continuing all efforts to deal with the rapidly increasing demand for water and adjusting itself structurally to the possibility of drought, which is a basic feature of the country's climate. Additionally, the Government is preparing a national plan for protecting water resources from pollution, taking appropriate measures for protecting drinking water outlets, identifying and controlling possible sources of water pollution, and developing water quality standards.
    كما ستواصل الدولة مجهوداتها من أجل مواجهة النمو السريع للحاجيات من الماء والتكيف بصفة هيكلية مع احتمالات الجفاف التي تعد خاصية أساسية لمناخ البلاد، إضافة إلى إعدادها لمخطط وطني لحماية الموارد المائية من التلوث وإعداد دوائر الحماية حول مصادر التزويد بالماء الصالح للشرب ومواصلة جرد مصادر التلوث ومتابعة وضع معايير جودة الماء.